Provision for a pit mounted double scissor lift for loading & unloading of drums
Home » Case Study's » Provision for a pit mounted double scissor lift for loading & unloading of drums
Table of Contents
The Challenges
Nandan was approached by a company for their material handling requirement wherein they needed a solution to lift goods from the ground floor loading bay to the first floor loading bay .
There was also the need for a solution which would not obstruct flow of work outside.
Solution
- Nandan designed the customized Lift with a pit mounted Double Scissor lift & installed it for the client in the stipulated time period.
- The Scissor Lift is enclosed by railings on two sides for safety & open on two sides for ease of access of Drums and materials.
- The truck unloads the Drums onto the Scissor Lift which is on the Ground floor flushed to the ground, thereafter lifting the load to the first floor & proceeding further.
Results
- Effectiveness of Loading & Unloading increased which in turn increased Productivity , Performance & Safety.
- Ease of Handling Bigger Drums & materials has increased exponentially.
- Faster Loading & Unloading combined with reduction in Labor resulting in increased Profitability.
- The Lift makes Loading and Unloading of big capacity Drums a breeze while Keeping Labor costs to a bare minimum and safety as High Priority.
- The pit mounted solution creates no obstruction to work outside whenever the scissor lift is not being used.
Share This Case Study
Contact Us
Please fill up the below details our executive will call you shortly.