Installing an engine test cell platform for the routine maintenance of aircraft engines

Table of Contents

Challenges

A Japanese multinational industrial gas manufacturer approached Nandan for a a lifting solution for their medical oxygen gas cylinder needs

It had to be a solution where the equipment is fitted onto the truck as the operation would be done in multiple locations

Increase in safety & efficiency was of utmost importance 

Solutions

A Hydraulic column tail lift was suggested & installed on their truck for the lifting of oxygen gas cylinders 

The platform of the column tail lift were given railings on the sides for additional safety

The platform was given an additional flap for the easy loading of cylinders with pallets

Result

Safety increased due to reduction of manual labor for the lifting of gas cylinders

Faster loading & unloading of cylinders increasing efficiency

Can be operated easily by the truck driver himself reducing the need for multiple users

Share This Case Study

Contact Us

Please fill up the below details our executive will call you shortly.

Let’s Stay in Touch!

Sign up to hear from us about new launches, helpful tips, and exciting updates.

  • This field is for validation purposes and should be left unchanged.

Schedule A Virtual Plant Visit